perm filename M81206.OUT[PRO,HE]1 blob sn#560576 filedate 1981-02-06 generic text, type C, neo UTF8
COMMENT ⊗   VALID 00117 PAGES
C REC  PAGE   DESCRIPTION
C00001 00001
C00012 00002	Source files for this output.
C00013 00003	Grant status for ALCOA at the end of 12/80
C00015 00004	Projection for ALCOA for the month 01/81
C00017 00005	Projection for ALCOA for the month 02/81
C00019 00006	Projection for ALCOA for the month 03/81
C00021 00007	Projection for ALCOA for the month 04/81
C00023 00008	Projection for ALCOA for the month 05/81
C00025 00009	Projection for ALCOA for the month 06/81
C00027 00010	Projection for ALCOA for the month 07/81
C00029 00011	Projection for ALCOA for the month 08/81
C00031 00012	Projection for ALCOA for the month 09/81
C00033 00013	Summary of ALCOA by month by expenditure type.
C00035 00014	Grant status for ARPA at the end of 12/80
C00037 00015	Projection for ARPA for the month 01/81
C00041 00016	Projection for ARPA for the month 02/81
C00044 00017	Projection for ARPA for the month 03/81
C00048 00018	Projection for ARPA for the month 04/81
C00052 00019	Projection for ARPA for the month 05/81
C00056 00020	Projection for ARPA for the month 06/81
C00060 00021	Projection for ARPA for the month 07/81
C00064 00022	Projection for ARPA for the month 08/81
C00068 00023	Projection for ARPA for the month 09/81
C00072 00024	Summary of ARPA by month by expenditure type.
C00074 00025	Grant status for CONF81 at the end of 12/80
C00076 00026	Projection for CONF81 for the month 01/81
C00079 00027	Projection for CONF81 for the month 02/81
C00081 00028	Projection for CONF81 for the month 03/81
C00083 00029	Projection for CONF81 for the month 04/81
C00085 00030	Projection for CONF81 for the month 05/81
C00087 00031	Projection for CONF81 for the month 06/81
C00089 00032	Projection for CONF81 for the month 07/81
C00091 00033	Projection for CONF81 for the month 08/81
C00093 00034	Projection for CONF81 for the month 09/81
C00095 00035	Summary of CONF81 by month by expenditure type.
C00097 00036	Grant status for GM at the end of 12/80
C00099 00037	Projection for GM for the month 01/81
C00102 00038	Projection for GM for the month 02/81
C00105 00039	Projection for GM for the month 03/81
C00107 00040	Projection for GM for the month 04/81
C00109 00041	Projection for GM for the month 05/81
C00111 00042	Projection for GM for the month 06/81
C00113 00043	Projection for GM for the month 07/81
C00115 00044	Projection for GM for the month 08/81
C00117 00045	Projection for GM for the month 09/81
C00119 00046	Summary of GM by month by expenditure type.
C00121 00047	Grant status for NASA at the end of 12/80
C00123 00048	Projection for NASA for the month 01/81
C00125 00049	Projection for NASA for the month 02/81
C00127 00050	Projection for NASA for the month 03/81
C00129 00051	Projection for NASA for the month 04/81
C00131 00052	Projection for NASA for the month 05/81
C00133 00053	Projection for NASA for the month 06/81
C00135 00054	Projection for NASA for the month 07/81
C00137 00055	Projection for NASA for the month 08/81
C00139 00056	Projection for NASA for the month 09/81
C00141 00057	Summary of NASA by month by expenditure type.
C00143 00058	Grant status for NSF78 at the end of 12/80
C00145 00059	Projection for NSF78 for the month 01/81
C00149 00060	Projection for NSF78 for the month 02/81
C00152 00061	Projection for NSF78 for the month 03/81
C00154 00062	Projection for NSF78 for the month 04/81
C00156 00063	Projection for NSF78 for the month 05/81
C00158 00064	Projection for NSF78 for the month 06/81
C00160 00065	Projection for NSF78 for the month 07/81
C00162 00066	Projection for NSF78 for the month 08/81
C00164 00067	Projection for NSF78 for the month 09/81
C00166 00068	Summary of NSF78 by month by expenditure type.
C00168 00069	Grant status for NSF81 at the end of 12/80
C00170 00070	Projection for NSF81 for the month 01/81
C00172 00071	Projection for NSF81 for the month 02/81
C00174 00072	Projection for NSF81 for the month 03/81
C00177 00073	Projection for NSF81 for the month 04/81
C00180 00074	Projection for NSF81 for the month 05/81
C00183 00075	Projection for NSF81 for the month 06/81
C00186 00076	Projection for NSF81 for the month 07/81
C00189 00077	Projection for NSF81 for the month 08/81
C00192 00078	Projection for NSF81 for the month 09/81
C00195 00079	Summary of NSF81 by month by expenditure type.
C00197 00080	Grant status for SRI at the end of 12/80
C00199 00081	Projection for SRI for the month 01/81
C00202 00082	Projection for SRI for the month 02/81
C00205 00083	Projection for SRI for the month 03/81
C00207 00084	Projection for SRI for the month 04/81
C00209 00085	Projection for SRI for the month 05/81
C00211 00086	Projection for SRI for the month 06/81
C00213 00087	Projection for SRI for the month 07/81
C00215 00088	Projection for SRI for the month 08/81
C00217 00089	Projection for SRI for the month 09/81
C00219 00090	Summary of SRI by month by expenditure type.
C00221 00091	Summary of ARNOLD on all grants from 01/81 thru 09/81
C00222 00092	Summary of BAKER on all grants from 01/81 thru 09/81
C00223 00093	Summary of BINFORD on all grants from 01/81 thru 09/81
C00225 00094	Summary of BLICHER on all grants from 01/81 thru 09/81
C00226 00095	Summary of BROOKS on all grants from 01/81 thru 09/81
C00227 00096	Summary of CLARKSON on all grants from 01/81 thru 09/81
C00228 00097	Summary of CRAIG on all grants from 01/81 thru 09/81
C00229 00098	Summary of GHOSH on all grants from 01/81 thru 09/81
C00230 00099	Summary of GOLDMAN on all grants from 01/81 thru 09/81
C00231 00100	Summary of HOCHSCHILD on all grants from 01/81 thru 09/81
C00232 00101	Summary of L-CHRISTOPHER on all grants from 01/81 thru 09/81
C00233 00102	Summary of LIEBES on all grants from 01/81 thru 09/81
C00235 00103	Summary of LOWE on all grants from 01/81 thru 09/81
C00236 00104	Summary of LOWRY on all grants from 01/81 thru 09/81
C00237 00105	Summary of MAPLES on all grants from 01/81 thru 09/81
C00238 00106	Summary of MARIMONT on all grants from 01/81 thru 09/81
C00239 00107	Summary of MILLER on all grants from 01/81 thru 09/81
C00240 00108	Summary of MUJTABA on all grants from 01/81 thru 09/81
C00241 00109	Summary of RUTENBURG on all grants from 01/81 thru 09/81
C00242 00110	Summary of SALISBURY on all grants from 01/81 thru 09/81
C00243 00111	Summary of SCHWETZ on all grants from 01/81 thru 09/81
C00244 00112	Summary of SIROKER on all grants from 01/81 thru 09/81
C00246 00113	Summary of SOROKA on all grants from 01/81 thru 09/81
C00248 00114	Summary of CAPITAL-EQUIPMENT by month by grant.
C00250 00115	Summary of TRAVEL by month by grant.
C00252 00116	Summary of TOTAL-SPENT-THIS-MONTH by month by grant.
C00254 00117	Summary of BALANCE-REMAINING by month by grant.
C00256 ENDMK
C⊗;
Source files for this output.

Done with BUDGET on 02/06/81 at 02:30:24 by BIS

cmd    file
---    ----
EXE    BIS.EXE[PRO,HE]
READ   SALARY.IN[PRO,HE]
EXE    BIS.GS[PRO,HE]
READ   BIS.IN[PRO,HE]
Grant status for ALCOA at the end of 12/80

                                     To Date   Budgeted  Remaining
                                     -------   --------  ---------
SALARIES AND WAGES                      0.00    8013.32    8013.32

STAFF BENEFITS                          0.00       0.00       0.00

CAPITAL EXPENDITURES                    0.00       0.00       0.00

TRAVEL                                  0.00       0.00       0.00

EXPENDABLE MATERIALS                    0.00       0.00       0.00

INDIRECT COSTS                          0.00       0.00       0.00

TOTAL                                   0.00    8013.32    8013.32
Projection for ALCOA for the month 01/81

Prepared by BIS using BUDGET on 02/06/81 at 02:30:26

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 SOROKA      40 %of    2083.00       833.20 
                                 ----------
TOTAL SALARIES AND WAGES             833.20      833.20     8013.32     7180.12 


STAFF BENEFITS at 0.192              159.97      159.97        0.00      159.97-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00        0.00        0.00        0.00 


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00        0.00        0.00        0.00 


EXPENDABLE MATERIALS
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS         0.00        0.00        0.00        0.00 


INDIRECT COSTS at 0.0                  0.00        0.00        0.00        0.00 

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                          993.17      993.17     8013.32     7020.14 
Projection for ALCOA for the month 02/81

Prepared by BIS using BUDGET on 02/06/81 at 02:30:26

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 SOROKA      40 %of    2083.00       833.20 
                                 ----------
TOTAL SALARIES AND WAGES             833.20     1666.40     8013.32     6346.92 


STAFF BENEFITS at 0.192              159.97      319.94        0.00      319.94-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00        0.00        0.00        0.00 


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00        0.00        0.00        0.00 


EXPENDABLE MATERIALS
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS         0.00        0.00        0.00        0.00 


INDIRECT COSTS at 0.0                  0.00        0.00        0.00        0.00 

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                          993.17     1986.34     8013.32     6026.97 
Projection for ALCOA for the month 03/81

Prepared by BIS using BUDGET on 02/06/81 at 02:30:27

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
                                 ----------
TOTAL SALARIES AND WAGES               0.00     1666.40     8013.32     6346.92 


STAFF BENEFITS at 0.192                0.00      319.94        0.00      319.94-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00        0.00        0.00        0.00 


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00        0.00        0.00        0.00 


EXPENDABLE MATERIALS
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS         0.00        0.00        0.00        0.00 


INDIRECT COSTS at 0.0                  0.00        0.00        0.00        0.00 

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                            0.00     1986.34     8013.32     6026.97 
Projection for ALCOA for the month 04/81

Prepared by BIS using BUDGET on 02/06/81 at 02:30:27

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
                                 ----------
TOTAL SALARIES AND WAGES               0.00     1666.40     8013.32     6346.92 


STAFF BENEFITS at 0.192                0.00      319.94        0.00      319.94-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00        0.00        0.00        0.00 


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00        0.00        0.00        0.00 


EXPENDABLE MATERIALS
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS         0.00        0.00        0.00        0.00 


INDIRECT COSTS at 0.0                  0.00        0.00        0.00        0.00 

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                            0.00     1986.34     8013.32     6026.97 
Projection for ALCOA for the month 05/81

Prepared by BIS using BUDGET on 02/06/81 at 02:30:28

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
                                 ----------
TOTAL SALARIES AND WAGES               0.00     1666.40     8013.32     6346.92 


STAFF BENEFITS at 0.192                0.00      319.94        0.00      319.94-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00        0.00        0.00        0.00 


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00        0.00        0.00        0.00 


EXPENDABLE MATERIALS
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS         0.00        0.00        0.00        0.00 


INDIRECT COSTS at 0.0                  0.00        0.00        0.00        0.00 

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                            0.00     1986.34     8013.32     6026.97 
Projection for ALCOA for the month 06/81

Prepared by BIS using BUDGET on 02/06/81 at 02:30:28

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
                                 ----------
TOTAL SALARIES AND WAGES               0.00     1666.40     8013.32     6346.92 


STAFF BENEFITS at 0.192                0.00      319.94        0.00      319.94-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00        0.00        0.00        0.00 


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00        0.00        0.00        0.00 


EXPENDABLE MATERIALS
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS         0.00        0.00        0.00        0.00 


INDIRECT COSTS at 0.0                  0.00        0.00        0.00        0.00 

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                            0.00     1986.34     8013.32     6026.97 
Projection for ALCOA for the month 07/81

Prepared by BIS using BUDGET on 02/06/81 at 02:30:28

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
                                 ----------
TOTAL SALARIES AND WAGES               0.00     1666.40     8013.32     6346.92 


STAFF BENEFITS at 0.192                0.00      319.94        0.00      319.94-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00        0.00        0.00        0.00 


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00        0.00        0.00        0.00 


EXPENDABLE MATERIALS
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS         0.00        0.00        0.00        0.00 


INDIRECT COSTS at 0.0                  0.00        0.00        0.00        0.00 

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                            0.00     1986.34     8013.32     6026.97 
Projection for ALCOA for the month 08/81

Prepared by BIS using BUDGET on 02/06/81 at 02:30:29

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
                                 ----------
TOTAL SALARIES AND WAGES               0.00     1666.40     8013.32     6346.92 


STAFF BENEFITS at 0.192                0.00      319.94        0.00      319.94-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00        0.00        0.00        0.00 


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00        0.00        0.00        0.00 


EXPENDABLE MATERIALS
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS         0.00        0.00        0.00        0.00 


INDIRECT COSTS at 0.0                  0.00        0.00        0.00        0.00 

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                            0.00     1986.34     8013.32     6026.97 
Projection for ALCOA for the month 09/81

Prepared by BIS using BUDGET on 02/06/81 at 02:30:29

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
                                 ----------
TOTAL SALARIES AND WAGES               0.00     1666.40     8013.32     6346.92 


STAFF BENEFITS at 0.212                0.00      319.94        0.00      319.94-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00        0.00        0.00        0.00 


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00        0.00        0.00        0.00 


EXPENDABLE MATERIALS
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS         0.00        0.00        0.00        0.00 


INDIRECT COSTS at 0.0                  0.00        0.00        0.00        0.00 

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                            0.00     1986.34     8013.32     6026.97 
Summary of ALCOA by month by expenditure type.

         salary                                            total
          wages   capital           expendable  indirect    this    balance
month  benefits    equip     travel  materials    costs    month   remaining
-----  --------   -------    ------ ----------  --------   -----   ---------

01/81      993         0         0         0         0       993      7020 
02/81      993         0         0         0         0       993      6026 
03/81        0         0         0         0         0         0      6026 
04/81        0         0         0         0         0         0      6026 
05/81        0         0         0         0         0         0      6026 
06/81        0         0         0         0         0         0      6026 
07/81        0         0         0         0         0         0      6026 
08/81        0         0         0         0         0         0      6026 
09/81        0         0         0         0         0         0      6026 
Grant status for ARPA at the end of 12/80

                                     To Date   Budgeted  Remaining
                                     -------   --------  ---------
SALARIES AND WAGES                      0.00  203619.00  203619.00

STAFF BENEFITS                          0.00       0.00       0.00

CAPITAL EXPENDITURES                    0.00       0.00       0.00

TRAVEL                                  0.00       0.00       0.00

EXPENDABLE MATERIALS                    0.00       0.00       0.00

INDIRECT COSTS                          0.00       0.00       0.00

TOTAL                                   0.00  203619.00  203619.00
Projection for ARPA for the month 01/81

Prepared by BIS using BUDGET on 02/06/81 at 02:30:31

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 ARNOLD      50-%of    1202.00       601.00-
 BAKER       50-%of    1560.00       780.00-
 BINFORD     30 %of    3083.00       924.90 
 BLICHER     50 %of    1560.00       780.00 
 BROOKS      50 %of    1202.00       601.00 
 CLARKSON    25 %of    1114.00       278.50 
 GHOSH       50 %of    1114.00       557.00 
 HOCHSCHILD  25-%of    1114.00       278.50-
 LOWE        35 %of    1202.00       420.70 
 LOWRY       25 %of    1202.00       300.50 
 MARIMONT    50 %of    1114.00       557.00 
 MILLER      50 %of    1202.00       601.00 
 RUTENBURG   50 %of    1114.00       557.00 
 SOROKA      25 %of    2083.00       520.75 
 SCHWETZ      3 %of    1039.98        35.98 
                                 ----------
TOTAL SALARIES AND WAGES            4474.83     4474.83   203619.00   199144.16 


STAFF BENEFITS at 0.192              859.16      859.16        0.00      859.16-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00        0.00        0.00        0.00 


TRAVEL
  BIS-AAAI-24656                      85.00 
  TOB-MIAMI-AIRFARE                  722.00 
  TOB-DC-AIRFARE                     811.00 
  TOB-DC-ONR-REBATE                  744.00-
                                 ----------
TOTAL FOR TRAVEL                     874.00      874.00        0.00      874.00-


EXPENDABLE MATERIALS
  CSDCF-12/80                       3048.76 
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS      3048.76     3048.76        0.00     3048.76-


INDIRECT COSTS at 0.58              5368.92     5368.92        0.00     5368.92-

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                        14625.68    14625.68   203619.00   188993.31 
Projection for ARPA for the month 02/81

Prepared by BIS using BUDGET on 02/06/81 at 02:30:32

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 BINFORD     30 %of    3083.00       924.90 
 BLICHER     50 %of    1560.00       780.00 
 BROOKS      50 %of    1202.00       601.00 
 CLARKSON    25 %of    1114.00       278.50 
 GHOSH       50 %of    1114.00       557.00 
 LOWE        35 %of    1202.00       420.70 
 LOWRY       25 %of    1202.00       300.50 
 MARIMONT    50 %of    1114.00       557.00 
 MILLER      50 %of    1202.00       601.00 
 RUTENBURG   50 %of    1114.00       557.00 
 SIROKER     20 %of    1214.00       242.80 
 SOROKA      25 %of    2083.00       520.75 
 SCHWETZ     65 %of    1039.98       684.09 
                                 ----------
TOTAL SALARIES AND WAGES            7025.24    11500.08   203619.00   192118.91 


STAFF BENEFITS at 0.192             1348.84     2208.01        0.00     2208.01-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00        0.00        0.00        0.00 


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00      874.00        0.00      874.00-


EXPENDABLE MATERIALS
  CSDCF-ESTIMATED                   3144.20 
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS      3144.20     6192.96        0.00     6192.96-


INDIRECT COSTS at 0.58              6680.61    12049.53        0.00    12049.53-

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                        18198.90    32824.59   203619.00   170794.40 
Projection for ARPA for the month 03/81

Prepared by BIS using BUDGET on 02/06/81 at 02:30:33

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 ARNOLD      50 %of    1202.00       601.00 
 BAKER       50 %of    1560.00       780.00 
 BINFORD     50 %of    3083.00      1541.50 
 BLICHER     50 %of    1560.00       780.00 
 BROOKS      50 %of    1202.00       601.00 
 CLARKSON    25 %of    1114.00       278.50 
 GHOSH       50 %of    1114.00       557.00 
 HOCHSCHILD  25 %of    1114.00       278.50 
 LOWE        35 %of    1202.00       420.70 
 LOWRY       25 %of    1202.00       300.50 
 MARIMONT    50 %of    1114.00       557.00 
 MILLER      50 %of    1202.00       601.00 
 RUTENBURG   50 %of    1114.00       557.00 
 SIROKER     50 %of    1214.00       607.00 
 SOROKA      25 %of    2083.00       520.75 
                                 ----------
TOTAL SALARIES AND WAGES            8981.45    20481.53   203619.00   183137.46 


STAFF BENEFITS at 0.192             1724.43     3932.45        0.00     3932.45-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00        0.00        0.00        0.00 


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00      874.00        0.00      874.00-


EXPENDABLE MATERIALS
  CSDCF-ESTIMATED                   3144.20 
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS      3144.20     9337.16        0.00     9337.16-


INDIRECT COSTS at 0.58              8033.05    20082.58        0.00    20082.58-

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                        21883.14    54707.73   203619.00   148911.26 
Projection for ARPA for the month 04/81

Prepared by BIS using BUDGET on 02/06/81 at 02:30:33

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 ARNOLD      50 %of    1202.00       601.00 
 BAKER       50 %of    1560.00       780.00 
 BINFORD     50 %of    3083.00      1541.50 
 BLICHER     50 %of    1560.00       780.00 
 BROOKS      50 %of    1202.00       601.00 
 CLARKSON    25 %of    1114.00       278.50 
 GHOSH       50 %of    1114.00       557.00 
 HOCHSCHILD  25 %of    1114.00       278.50 
 LOWE        35 %of    1202.00       420.70 
 LOWRY       50 %of    1202.00       601.00 
 MARIMONT    50 %of    1114.00       557.00 
 MILLER      50 %of    1202.00       601.00 
 RUTENBURG   50 %of    1114.00       557.00 
 SIROKER     50 %of    1214.00       607.00 
 SOROKA      25 %of    2083.00       520.75 
                                 ----------
TOTAL SALARIES AND WAGES            9281.95    29763.48   203619.00   173855.51 


STAFF BENEFITS at 0.192             1782.13     5714.58        0.00     5714.58-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00        0.00        0.00        0.00 


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00      874.00        0.00      874.00-


EXPENDABLE MATERIALS
  CSDCF-ESTIMATED                   3144.20 
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS      3144.20    12481.36        0.00    12481.36-


INDIRECT COSTS at 0.58              8240.80    28323.39        0.00    28323.39-

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                        22449.08    77156.82   203619.00   126462.17 
Projection for ARPA for the month 05/81

Prepared by BIS using BUDGET on 02/06/81 at 02:30:35

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 ARNOLD      50 %of    1202.00       601.00 
 BAKER       50 %of    1560.00       780.00 
 BINFORD     50 %of    3083.00      1541.50 
 BLICHER     50 %of    1560.00       780.00 
 BROOKS      50 %of    1202.00       601.00 
 CLARKSON    25 %of    1114.00       278.50 
 GHOSH       50 %of    1114.00       557.00 
 HOCHSCHILD  25 %of    1114.00       278.50 
 LIEBES      19 %of    3041.00       577.79 
 LOWE        35 %of    1202.00       420.70 
 LOWRY       50 %of    1202.00       601.00 
 MARIMONT    50 %of    1114.00       557.00 
 MILLER      50 %of    1202.00       601.00 
 RUTENBURG   50 %of    1114.00       557.00 
 SIROKER     50 %of    1214.00       607.00 
 SOROKA      25 %of    2083.00       520.75 
                                 ----------
TOTAL SALARIES AND WAGES            9859.74    39623.22   203619.00   163995.77 


STAFF BENEFITS at 0.192             1893.07     7607.65        0.00     7607.65-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00        0.00        0.00        0.00 


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00      874.00        0.00      874.00-


EXPENDABLE MATERIALS
  CSDCF-ESTIMATED                   3144.20 
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS      3144.20    15625.56        0.00    15625.56-


INDIRECT COSTS at 0.58              8640.26    36963.65        0.00    36963.65-

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                        23537.27   100694.09   203619.00   102924.90 
Projection for ARPA for the month 06/81

Prepared by BIS using BUDGET on 02/06/81 at 02:30:37

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 ARNOLD      50 %of    1202.00       601.00 
 BAKER       50 %of    1560.00       780.00 
 BINFORD     50 %of    3083.00      1541.50 
 BLICHER     50 %of    1560.00       780.00 
 BROOKS      50 %of    1202.00       601.00 
 CLARKSON    25 %of    1114.00       278.50 
 GHOSH       50 %of    1114.00       557.00 
 HOCHSCHILD  25 %of    1114.00       278.50 
 LIEBES     100 %of    3041.00      3041.00 
 LOWE        35 %of    1202.00       420.70 
 LOWRY       50 %of    1202.00       601.00 
 MARIMONT    50 %of    1114.00       557.00 
 MILLER      50 %of    1202.00       601.00 
 RUTENBURG   50 %of    1114.00       557.00 
 SIROKER     50 %of    1214.00       607.00 
 SOROKA      25 %of    2083.00       520.75 
                                 ----------
TOTAL SALARIES AND WAGES           12322.95    51946.17   203619.00   151672.82 


STAFF BENEFITS at 0.192             2366.00     9973.66        0.00     9973.66-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00        0.00        0.00        0.00 


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00      874.00        0.00      874.00-


EXPENDABLE MATERIALS
  CSDCF-ESTIMATED                   3144.20 
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS      3144.20    18769.76        0.00    18769.76-


INDIRECT COSTS at 0.58             10343.23    47306.88        0.00    47306.88-

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                        28176.38   128870.48   203619.00    74748.51 
Projection for ARPA for the month 07/81

Prepared by BIS using BUDGET on 02/06/81 at 02:30:39

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 ARNOLD     100 %of    1202.00      1202.00 
 BAKER      100 %of    1560.00      1560.00 
 BINFORD     50 %of    3083.00      1541.50 
 BLICHER    100 %of    1560.00      1560.00 
 CLARKSON   100 %of    1114.00      1114.00 
 GHOSH      100 %of    1114.00      1114.00 
 HOCHSCHILD 100 %of    1114.00      1114.00 
 LIEBES     100 %of    3041.00      3041.00 
 LOWE       100 %of    1202.00      1202.00 
 LOWRY      100 %of    1202.00      1202.00 
 MARIMONT   100 %of    1114.00      1114.00 
 MILLER     100 %of    1202.00      1202.00 
 RUTENBURG  100 %of    1114.00      1114.00 
 SIROKER     50 %of    1214.00       607.00 
 SOROKA      25 %of    2083.00       520.75 
                                 ----------
TOTAL SALARIES AND WAGES           19208.25    71154.42   203619.00   132464.57 


STAFF BENEFITS at 0.192             3687.98    13661.64        0.00    13661.64-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00        0.00        0.00        0.00 


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00      874.00        0.00      874.00-


EXPENDABLE MATERIALS
  CSDCF-ESTIMATED                   3144.20 
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS      3144.20    21913.96        0.00    21913.96-


INDIRECT COSTS at 0.58             15103.45    62410.33        0.00    62410.33-

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                        41143.88   170014.37   203619.00    33604.62 
Projection for ARPA for the month 08/81

Prepared by BIS using BUDGET on 02/06/81 at 02:30:42

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 ARNOLD     100 %of    1202.00      1202.00 
 BAKER      100 %of    1560.00      1560.00 
 BINFORD     50 %of    3083.00      1541.50 
 BLICHER    100 %of    1560.00      1560.00 
 CLARKSON   100 %of    1114.00      1114.00 
 GHOSH      100 %of    1114.00      1114.00 
 HOCHSCHILD 100 %of    1114.00      1114.00 
 LIEBES     100 %of    3041.00      3041.00 
 LOWE       100 %of    1202.00      1202.00 
 LOWRY      100 %of    1202.00      1202.00 
 MARIMONT   100 %of    1114.00      1114.00 
 MILLER     100 %of    1202.00      1202.00 
 RUTENBURG  100 %of    1114.00      1114.00 
 SIROKER     50 %of    1214.00       607.00 
 SOROKA      25 %of    2083.00       520.75 
                                 ----------
TOTAL SALARIES AND WAGES           19208.25    90362.67   203619.00   113256.32 


STAFF BENEFITS at 0.192             3687.98    17349.63        0.00    17349.63-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00        0.00        0.00        0.00 


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00      874.00        0.00      874.00-


EXPENDABLE MATERIALS
  CSDCF-ESTIMATED                   3144.20 
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS      3144.20    25058.16        0.00    25058.16-


INDIRECT COSTS at 0.58             15103.45    77513.79        0.00    77513.79-

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                        41143.88   211158.25   203619.00     7539.25-
Projection for ARPA for the month 09/81

Prepared by BIS using BUDGET on 02/06/81 at 02:30:43

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 ARNOLD     100 %of    1202.00      1202.00 
 BAKER      100 %of    1715.99      1715.99 
 BINFORD     50 %of    3391.30      1695.65 
 BLICHER    100 %of    1715.99      1715.99 
 CLARKSON   100 %of    1114.00      1114.00 
 GHOSH      100 %of    1114.00      1114.00 
 HOCHSCHILD 100 %of    1114.00      1114.00 
 LIEBES     100 %of    3345.09      3345.09 
 LOWE       100 %of    1202.00      1202.00 
 LOWRY      100 %of    1202.00      1202.00 
 MARIMONT   100 %of    1114.00      1114.00 
 MILLER     100 %of    1202.00      1202.00 
 RUTENBURG  100 %of    1114.00      1114.00 
 SIROKER     50 %of    1318.90       659.45 
 SOROKA      25 %of    2291.30       572.82 
                                 ----------
TOTAL SALARIES AND WAGES           20083.02   110445.69   203619.00    93173.30 


STAFF BENEFITS at 0.212             4257.60    21607.23        0.00    21607.23-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00        0.00        0.00        0.00 


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00      874.00        0.00      874.00-


EXPENDABLE MATERIALS
  CSDCF-ESTIMATED                   3144.20 
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS      3144.20    28202.36        0.00    28202.36-


INDIRECT COSTS at 0.58             15941.19    93454.98        0.00    93454.98-

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                        43426.02   254584.28   203619.00    50965.28-
Summary of ARPA by month by expenditure type.

         salary                                            total
          wages   capital           expendable  indirect    this    balance
month  benefits    equip     travel  materials    costs    month   remaining
-----  --------   -------    ------ ----------  --------   -----   ---------

01/81     5334         0       874      3048      5368     14625    188993 
02/81     8374         0         0      3144      6680     18198    170794 
03/81    10705         0         0      3144      8033     21883    148911 
04/81    11064         0         0      3144      8240     22449    126462 
05/81    11752         0         0      3144      8640     23537    102924 
06/81    14688         0         0      3144     10343     28176     74748 
07/81    22896         0         0      3144     15103     41143     33604 
08/81    22896         0         0      3144     15103     41143      7540-
09/81    24340         0         0      3144     15941     43426     50966-
Grant status for CONF81 at the end of 12/80

                                     To Date   Budgeted  Remaining
                                     -------   --------  ---------
SALARIES AND WAGES                   3103.64   15952.00   12848.36

STAFF BENEFITS                          0.00       0.00       0.00

CAPITAL EXPENDITURES                    0.00       0.00       0.00

TRAVEL                                  0.00       0.00       0.00

EXPENDABLE MATERIALS                    0.00       0.00       0.00

INDIRECT COSTS                          0.00       0.00       0.00

TOTAL                                3103.64   15952.00   12848.36
Projection for CONF81 for the month 01/81

Prepared by BIS using BUDGET on 02/06/81 at 02:30:45

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 SIROKER    100 %of    1214.00      1214.00 
                                 ----------
TOTAL SALARIES AND WAGES            1214.00     4317.64    15952.00    11634.36 


STAFF BENEFITS at 0.192              233.08      233.08        0.00      233.08-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00        0.00        0.00        0.00 


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00        0.00        0.00        0.00 


EXPENDABLE MATERIALS
  PROCEEDINGS-188730                2520.00 
  BUSES-188731                       406.00 
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS      2926.00     2926.00        0.00     2926.00-


INDIRECT COSTS at 0.58              2536.39     2536.39        0.00     2536.39-

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                         6909.47    10013.11    15952.00     5938.88 
Projection for CONF81 for the month 02/81

Prepared by BIS using BUDGET on 02/06/81 at 02:30:46

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 SIROKER     70 %of    1214.00       849.80 
                                 ----------
TOTAL SALARIES AND WAGES             849.80     5167.44    15952.00    10784.56 


STAFF BENEFITS at 0.192              163.16      396.24        0.00      396.24-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00        0.00        0.00        0.00 


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00        0.00        0.00        0.00 


EXPENDABLE MATERIALS
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS         0.00     2926.00        0.00     2926.00-


INDIRECT COSTS at 0.58               587.51     3123.90        0.00     3123.90-

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                         1600.47    11613.59    15952.00     4338.40 
Projection for CONF81 for the month 03/81

Prepared by BIS using BUDGET on 02/06/81 at 02:30:47

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
                                 ----------
TOTAL SALARIES AND WAGES               0.00     5167.44    15952.00    10784.56 


STAFF BENEFITS at 0.192                0.00      396.24        0.00      396.24-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00        0.00        0.00        0.00 


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00        0.00        0.00        0.00 


EXPENDABLE MATERIALS
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS         0.00     2926.00        0.00     2926.00-


INDIRECT COSTS at 0.58                 0.00     3123.90        0.00     3123.90-

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                            0.00    11613.59    15952.00     4338.40 
Projection for CONF81 for the month 04/81

Prepared by BIS using BUDGET on 02/06/81 at 02:30:48

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
                                 ----------
TOTAL SALARIES AND WAGES               0.00     5167.44    15952.00    10784.56 


STAFF BENEFITS at 0.192                0.00      396.24        0.00      396.24-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00        0.00        0.00        0.00 


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00        0.00        0.00        0.00 


EXPENDABLE MATERIALS
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS         0.00     2926.00        0.00     2926.00-


INDIRECT COSTS at 0.58                 0.00     3123.90        0.00     3123.90-

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                            0.00    11613.59    15952.00     4338.40 
Projection for CONF81 for the month 05/81

Prepared by BIS using BUDGET on 02/06/81 at 02:30:48

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
                                 ----------
TOTAL SALARIES AND WAGES               0.00     5167.44    15952.00    10784.56 


STAFF BENEFITS at 0.192                0.00      396.24        0.00      396.24-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00        0.00        0.00        0.00 


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00        0.00        0.00        0.00 


EXPENDABLE MATERIALS
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS         0.00     2926.00        0.00     2926.00-


INDIRECT COSTS at 0.58                 0.00     3123.90        0.00     3123.90-

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                            0.00    11613.59    15952.00     4338.40 
Projection for CONF81 for the month 06/81

Prepared by BIS using BUDGET on 02/06/81 at 02:30:49

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
                                 ----------
TOTAL SALARIES AND WAGES               0.00     5167.44    15952.00    10784.56 


STAFF BENEFITS at 0.192                0.00      396.24        0.00      396.24-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00        0.00        0.00        0.00 


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00        0.00        0.00        0.00 


EXPENDABLE MATERIALS
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS         0.00     2926.00        0.00     2926.00-


INDIRECT COSTS at 0.58                 0.00     3123.90        0.00     3123.90-

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                            0.00    11613.59    15952.00     4338.40 
Projection for CONF81 for the month 07/81

Prepared by BIS using BUDGET on 02/06/81 at 02:30:50

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
                                 ----------
TOTAL SALARIES AND WAGES               0.00     5167.44    15952.00    10784.56 


STAFF BENEFITS at 0.192                0.00      396.24        0.00      396.24-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00        0.00        0.00        0.00 


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00        0.00        0.00        0.00 


EXPENDABLE MATERIALS
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS         0.00     2926.00        0.00     2926.00-


INDIRECT COSTS at 0.58                 0.00     3123.90        0.00     3123.90-

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                            0.00    11613.59    15952.00     4338.40 
Projection for CONF81 for the month 08/81

Prepared by BIS using BUDGET on 02/06/81 at 02:30:51

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
                                 ----------
TOTAL SALARIES AND WAGES               0.00     5167.44    15952.00    10784.56 


STAFF BENEFITS at 0.192                0.00      396.24        0.00      396.24-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00        0.00        0.00        0.00 


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00        0.00        0.00        0.00 


EXPENDABLE MATERIALS
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS         0.00     2926.00        0.00     2926.00-


INDIRECT COSTS at 0.58                 0.00     3123.90        0.00     3123.90-

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                            0.00    11613.59    15952.00     4338.40 
Projection for CONF81 for the month 09/81

Prepared by BIS using BUDGET on 02/06/81 at 02:30:51

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
                                 ----------
TOTAL SALARIES AND WAGES               0.00     5167.44    15952.00    10784.56 


STAFF BENEFITS at 0.212                0.00      396.24        0.00      396.24-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00        0.00        0.00        0.00 


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00        0.00        0.00        0.00 


EXPENDABLE MATERIALS
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS         0.00     2926.00        0.00     2926.00-


INDIRECT COSTS at 0.58                 0.00     3123.90        0.00     3123.90-

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                            0.00    11613.59    15952.00     4338.40 
Summary of CONF81 by month by expenditure type.

         salary                                            total
          wages   capital           expendable  indirect    this    balance
month  benefits    equip     travel  materials    costs    month   remaining
-----  --------   -------    ------ ----------  --------   -----   ---------

01/81     1447         0         0      2926      2536      6909      5938 
02/81     1012         0         0         0       587      1600      4338 
03/81        0         0         0         0         0         0      4338 
04/81        0         0         0         0         0         0      4338 
05/81        0         0         0         0         0         0      4338 
06/81        0         0         0         0         0         0      4338 
07/81        0         0         0         0         0         0      4338 
08/81        0         0         0         0         0         0      4338 
09/81        0         0         0         0         0         0      4338 
Grant status for GM at the end of 12/80

                                     To Date   Budgeted  Remaining
                                     -------   --------  ---------
SALARIES AND WAGES                      0.00   15624.66   15624.66

STAFF BENEFITS                          0.00       0.00       0.00

CAPITAL EXPENDITURES                    0.00       0.00       0.00

TRAVEL                                  0.00       0.00       0.00

EXPENDABLE MATERIALS                    0.00       0.00       0.00

INDIRECT COSTS                          0.00       0.00       0.00

TOTAL                                   0.00   15624.66   15624.66
Projection for GM for the month 01/81

Prepared by BIS using BUDGET on 02/06/81 at 02:30:53

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 SOROKA      35 %of    2083.00       729.05 
 L-CHRISTOP 100-%of     227.21       227.21-
                                 ----------
TOTAL SALARIES AND WAGES             501.84      501.84    15624.66    15122.82 


STAFF BENEFITS at 0.192               96.35       96.35        0.00       96.35-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00        0.00        0.00        0.00 


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00        0.00        0.00        0.00 


EXPENDABLE MATERIALS
  FREIGHT-PUMA-PARTS                  54.99 
  FLASHLIGHT-SLIDES                   85.99 
  ANSWER-PRINT-188729                211.00 
  GRANTEES-RECEIPTS                 9465.00-
  HOLIDAY-INN                      13000.00 
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS      3886.97     3886.97        0.00     3886.97-


INDIRECT COSTS at 0.0                  0.00        0.00        0.00        0.00 

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                         4485.17     4485.17    15624.66    11139.48 
Projection for GM for the month 02/81

Prepared by BIS using BUDGET on 02/06/81 at 02:30:55

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 SOROKA      35 %of    2083.00       729.05 
                                 ----------
TOTAL SALARIES AND WAGES             729.05     1230.89    15624.66    14393.77 


STAFF BENEFITS at 0.192              139.97      236.33        0.00      236.33-


CAPITAL EXPENDITURES
  ZENITH-TERMINAL                    756.15 
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES       756.15      756.15        0.00      756.15-


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00        0.00        0.00        0.00 


EXPENDABLE MATERIALS
  SPRINKLER-FILM                     580.00 
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS       580.00     4466.98        0.00     4466.98-


INDIRECT COSTS at 0.0                  0.00        0.00        0.00        0.00 

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                         2205.17     6690.35    15624.66     8934.30 
Projection for GM for the month 03/81

Prepared by BIS using BUDGET on 02/06/81 at 02:30:56

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
                                 ----------
TOTAL SALARIES AND WAGES               0.00     1230.89    15624.66    14393.77 


STAFF BENEFITS at 0.192                0.00      236.33        0.00      236.33-


CAPITAL EXPENDITURES
  ZENITH-TERMINAL-REF                756.15-
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES       756.15-       0.00        0.00        0.00 


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00        0.00        0.00        0.00 


EXPENDABLE MATERIALS
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS         0.00     4466.98        0.00     4466.98-


INDIRECT COSTS at 0.0                  0.00        0.00        0.00        0.00 

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                          756.15-    5934.20    15624.66     9690.45 
Projection for GM for the month 04/81

Prepared by BIS using BUDGET on 02/06/81 at 02:30:57

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
                                 ----------
TOTAL SALARIES AND WAGES               0.00     1230.89    15624.66    14393.77 


STAFF BENEFITS at 0.192                0.00      236.33        0.00      236.33-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00        0.00        0.00        0.00 


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00        0.00        0.00        0.00 


EXPENDABLE MATERIALS
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS         0.00     4466.98        0.00     4466.98-


INDIRECT COSTS at 0.0                  0.00        0.00        0.00        0.00 

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                            0.00     5934.20    15624.66     9690.45 
Projection for GM for the month 05/81

Prepared by BIS using BUDGET on 02/06/81 at 02:31:00

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
                                 ----------
TOTAL SALARIES AND WAGES               0.00     1230.89    15624.66    14393.77 


STAFF BENEFITS at 0.192                0.00      236.33        0.00      236.33-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00        0.00        0.00        0.00 


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00        0.00        0.00        0.00 


EXPENDABLE MATERIALS
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS         0.00     4466.98        0.00     4466.98-


INDIRECT COSTS at 0.0                  0.00        0.00        0.00        0.00 

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                            0.00     5934.20    15624.66     9690.45 
Projection for GM for the month 06/81

Prepared by BIS using BUDGET on 02/06/81 at 02:31:01

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
                                 ----------
TOTAL SALARIES AND WAGES               0.00     1230.89    15624.66    14393.77 


STAFF BENEFITS at 0.192                0.00      236.33        0.00      236.33-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00        0.00        0.00        0.00 


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00        0.00        0.00        0.00 


EXPENDABLE MATERIALS
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS         0.00     4466.98        0.00     4466.98-


INDIRECT COSTS at 0.0                  0.00        0.00        0.00        0.00 

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                            0.00     5934.20    15624.66     9690.45 
Projection for GM for the month 07/81

Prepared by BIS using BUDGET on 02/06/81 at 02:31:01

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
                                 ----------
TOTAL SALARIES AND WAGES               0.00     1230.89    15624.66    14393.77 


STAFF BENEFITS at 0.192                0.00      236.33        0.00      236.33-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00        0.00        0.00        0.00 


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00        0.00        0.00        0.00 


EXPENDABLE MATERIALS
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS         0.00     4466.98        0.00     4466.98-


INDIRECT COSTS at 0.0                  0.00        0.00        0.00        0.00 

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                            0.00     5934.20    15624.66     9690.45 
Projection for GM for the month 08/81

Prepared by BIS using BUDGET on 02/06/81 at 02:31:01

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
                                 ----------
TOTAL SALARIES AND WAGES               0.00     1230.89    15624.66    14393.77 


STAFF BENEFITS at 0.192                0.00      236.33        0.00      236.33-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00        0.00        0.00        0.00 


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00        0.00        0.00        0.00 


EXPENDABLE MATERIALS
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS         0.00     4466.98        0.00     4466.98-


INDIRECT COSTS at 0.0                  0.00        0.00        0.00        0.00 

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                            0.00     5934.20    15624.66     9690.45 
Projection for GM for the month 09/81

Prepared by BIS using BUDGET on 02/06/81 at 02:31:02

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
                                 ----------
TOTAL SALARIES AND WAGES               0.00     1230.89    15624.66    14393.77 


STAFF BENEFITS at 0.212                0.00      236.33        0.00      236.33-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00        0.00        0.00        0.00 


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00        0.00        0.00        0.00 


EXPENDABLE MATERIALS
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS         0.00     4466.98        0.00     4466.98-


INDIRECT COSTS at 0.0                  0.00        0.00        0.00        0.00 

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                            0.00     5934.20    15624.66     9690.45 
Summary of GM by month by expenditure type.

         salary                                            total
          wages   capital           expendable  indirect    this    balance
month  benefits    equip     travel  materials    costs    month   remaining
-----  --------   -------    ------ ----------  --------   -----   ---------

01/81      598         0         0      3886         0      4485     11139 
02/81      869       756         0       580         0      2205      8934 
03/81        0       757-        0         0         0       757-     9690 
04/81        0         0         0         0         0         0      9690 
05/81        0         0         0         0         0         0      9690 
06/81        0         0         0         0         0         0      9690 
07/81        0         0         0         0         0         0      9690 
08/81        0         0         0         0         0         0      9690 
09/81        0         0         0         0         0         0      9690 
Grant status for NASA at the end of 12/80

                                     To Date   Budgeted  Remaining
                                     -------   --------  ---------
SALARIES AND WAGES                      0.00   24740.00   24740.00

STAFF BENEFITS                          0.00       0.00       0.00

CAPITAL EXPENDITURES                    0.00       0.00       0.00

TRAVEL                                  0.00       0.00       0.00

EXPENDABLE MATERIALS                    0.00       0.00       0.00

INDIRECT COSTS                          0.00       0.00       0.00

TOTAL                                   0.00   24740.00   24740.00
Projection for NASA for the month 01/81

Prepared by BIS using BUDGET on 02/06/81 at 02:31:03

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 LIEBES      70 %of    3041.00      2128.70 
                                 ----------
TOTAL SALARIES AND WAGES            2128.70     2128.70    24740.00    22611.30 


STAFF BENEFITS at 0.192              408.71      408.71        0.00      408.71-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00        0.00        0.00        0.00 


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00        0.00        0.00        0.00 


EXPENDABLE MATERIALS
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS         0.00        0.00        0.00        0.00 


INDIRECT COSTS at 0.58              1471.69     1471.69        0.00     1471.69-

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                         4009.10     4009.10    24740.00    20730.89 
Projection for NASA for the month 02/81

Prepared by BIS using BUDGET on 02/06/81 at 02:31:04

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 LIEBES      31 %of    3041.00       942.71 
                                 ----------
TOTAL SALARIES AND WAGES             942.71     3071.41    24740.00    21668.59 


STAFF BENEFITS at 0.192              181.00      589.71        0.00      589.71-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00        0.00        0.00        0.00 


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00        0.00        0.00        0.00 


EXPENDABLE MATERIALS
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS         0.00        0.00        0.00        0.00 


INDIRECT COSTS at 0.58               651.75     2123.45        0.00     2123.45-

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                         1775.46     5784.57    24740.00    18955.42 
Projection for NASA for the month 03/81

Prepared by BIS using BUDGET on 02/06/81 at 02:31:04

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 LIEBES     100 %of    3041.00      3041.00 
                                 ----------
TOTAL SALARIES AND WAGES            3041.00     6112.41    24740.00    18627.59 


STAFF BENEFITS at 0.192              583.87     1173.58        0.00     1173.58-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00        0.00        0.00        0.00 


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00        0.00        0.00        0.00 


EXPENDABLE MATERIALS
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS         0.00        0.00        0.00        0.00 


INDIRECT COSTS at 0.58              2102.42     4225.87        0.00     4225.87-

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                         5727.29    11511.86    24740.00    13228.13 
Projection for NASA for the month 04/81

Prepared by BIS using BUDGET on 02/06/81 at 02:31:05

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 LIEBES     100 %of    3041.00      3041.00 
                                 ----------
TOTAL SALARIES AND WAGES            3041.00     9153.41    24740.00    15586.59 


STAFF BENEFITS at 0.192              583.87     1757.45        0.00     1757.45-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00        0.00        0.00        0.00 


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00        0.00        0.00        0.00 


EXPENDABLE MATERIALS
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS         0.00        0.00        0.00        0.00 


INDIRECT COSTS at 0.58              2102.42     6328.30        0.00     6328.30-

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                         5727.29    17239.16    24740.00     7500.83 
Projection for NASA for the month 05/81

Prepared by BIS using BUDGET on 02/06/81 at 02:31:05

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 LIEBES      81 %of    3041.00      2463.21 
                                 ----------
TOTAL SALARIES AND WAGES            2463.21    11616.62    24740.00    13123.37 


STAFF BENEFITS at 0.192              472.93     2230.39        0.00     2230.39-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00        0.00        0.00        0.00 


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00        0.00        0.00        0.00 


EXPENDABLE MATERIALS
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS         0.00        0.00        0.00        0.00 


INDIRECT COSTS at 0.58              1702.96     8031.26        0.00     8031.26-

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                         4639.11    21878.27    24740.00     2861.72 
Projection for NASA for the month 06/81

Prepared by BIS using BUDGET on 02/06/81 at 02:31:05

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
                                 ----------
TOTAL SALARIES AND WAGES               0.00    11616.62    24740.00    13123.37 


STAFF BENEFITS at 0.192                0.00     2230.39        0.00     2230.39-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00        0.00        0.00        0.00 


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00        0.00        0.00        0.00 


EXPENDABLE MATERIALS
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS         0.00        0.00        0.00        0.00 


INDIRECT COSTS at 0.58                 0.00     8031.26        0.00     8031.26-

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                            0.00    21878.27    24740.00     2861.72 
Projection for NASA for the month 07/81

Prepared by BIS using BUDGET on 02/06/81 at 02:31:06

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
                                 ----------
TOTAL SALARIES AND WAGES               0.00    11616.62    24740.00    13123.37 


STAFF BENEFITS at 0.192                0.00     2230.39        0.00     2230.39-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00        0.00        0.00        0.00 


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00        0.00        0.00        0.00 


EXPENDABLE MATERIALS
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS         0.00        0.00        0.00        0.00 


INDIRECT COSTS at 0.58                 0.00     8031.26        0.00     8031.26-

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                            0.00    21878.27    24740.00     2861.72 
Projection for NASA for the month 08/81

Prepared by BIS using BUDGET on 02/06/81 at 02:31:06

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
                                 ----------
TOTAL SALARIES AND WAGES               0.00    11616.62    24740.00    13123.37 


STAFF BENEFITS at 0.192                0.00     2230.39        0.00     2230.39-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00        0.00        0.00        0.00 


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00        0.00        0.00        0.00 


EXPENDABLE MATERIALS
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS         0.00        0.00        0.00        0.00 


INDIRECT COSTS at 0.58                 0.00     8031.26        0.00     8031.26-

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                            0.00    21878.27    24740.00     2861.72 
Projection for NASA for the month 09/81

Prepared by BIS using BUDGET on 02/06/81 at 02:31:07

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
                                 ----------
TOTAL SALARIES AND WAGES               0.00    11616.62    24740.00    13123.37 


STAFF BENEFITS at 0.212                0.00     2230.39        0.00     2230.39-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00        0.00        0.00        0.00 


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00        0.00        0.00        0.00 


EXPENDABLE MATERIALS
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS         0.00        0.00        0.00        0.00 


INDIRECT COSTS at 0.58                 0.00     8031.26        0.00     8031.26-

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                            0.00    21878.27    24740.00     2861.72 
Summary of NASA by month by expenditure type.

         salary                                            total
          wages   capital           expendable  indirect    this    balance
month  benefits    equip     travel  materials    costs    month   remaining
-----  --------   -------    ------ ----------  --------   -----   ---------

01/81     2537         0         0         0      1471      4009     20730 
02/81     1123         0         0         0       651      1775     18955 
03/81     3624         0         0         0      2102      5727     13228 
04/81     3624         0         0         0      2102      5727      7500 
05/81     2936         0         0         0      1702      4639      2861 
06/81        0         0         0         0         0         0      2861 
07/81        0         0         0         0         0         0      2861 
08/81        0         0         0         0         0         0      2861 
09/81        0         0         0         0         0         0      2861 
Grant status for NSF78 at the end of 12/80

                                     To Date   Budgeted  Remaining
                                     -------   --------  ---------
SALARIES AND WAGES                 245547.06  257964.00   12416.93

STAFF BENEFITS                      48064.16   57346.00    9281.83

CAPITAL EXPENDITURES                27129.32   17405.00    9724.32-

TRAVEL                               6936.89   13200.00    6263.11

EXPENDABLE MATERIALS                44545.80   34365.00   10180.79-

INDIRECT COSTS                     201954.59  219720.00   17765.41

TOTAL                              574177.83  600000.00   25822.17
Projection for NSF78 for the month 01/81

Prepared by BIS using BUDGET on 02/06/81 at 02:31:08

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 CRAIG       50 %of    1114.00       557.00 
 GOLDMAN     50 %of    1202.00       601.00 
 MAPLES      25 %of    1114.00       278.50 
 MUJTABA     50 %of    1202.00       601.00 
 SALISBURY  100-%of    1202.00      1202.00-
                                 ----------
TOTAL SALARIES AND WAGES             835.50   246382.56   257964.00    11581.43 


STAFF BENEFITS at 0.192              160.41    48224.57    57346.00     9121.42 


CAPITAL EXPENDITURES
  DR11-C                             425.00 
  RSX11                             3395.22 
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES      3820.22    30949.54    17405.00    13544.54-


TRAVEL
  BIS-CADCAM-OTHER                    24.05 
  JKS-NEW-MEXICO-36567               188.00 
                                 ----------
TOTAL FOR TRAVEL                     212.05     7148.94    13200.00     6051.06 


EXPENDABLE MATERIALS
  LAMPS-291135                        91.86 
  CONNECTORS-291128                   37.00 
  POWER-SUPPLY-291146                 74.50 
  DEVELOPING-FILM-291136              28.76 
  WORK-PRINTS-291143                  65.02 
  REPAIR-TERMINAL-291112             213.00 
  FIX-PDP11                         1253.00 
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS      1763.14    46308.94    34365.00    11943.94-


INDIRECT COSTS at 0.58              1723.24   203677.83   219720.00    16042.16 

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                         8514.56   582692.39   600000.00    17307.60 
Projection for NSF78 for the month 02/81

Prepared by BIS using BUDGET on 02/06/81 at 02:31:10

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 CRAIG       50 %of    1114.00       557.00 
 GOLDMAN     50 %of    1202.00       601.00 
 MAPLES      25 %of    1114.00       278.50 
 MUJTABA     50 %of    1202.00       601.00 
                                 ----------
TOTAL SALARIES AND WAGES            2037.50   248420.06   257964.00     9543.93 


STAFF BENEFITS at 0.192              391.20    48615.77    57346.00     8730.22 


CAPITAL EXPENDITURES
  PUMA-RETROFIT                     8004.00 
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES      8004.00    38953.54    17405.00    21548.54-


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00     7148.94    13200.00     6051.06 


EXPENDABLE MATERIALS
  FLASHLIGHT-FILM-COPIES             900.00 
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS       900.00    47208.94    34365.00    12843.94-


INDIRECT COSTS at 0.58              1930.64   205608.47   219720.00    14111.52 

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                        13263.34   595955.73   600000.00     4044.26 
Projection for NSF78 for the month 03/81

Prepared by BIS using BUDGET on 02/06/81 at 02:31:11

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
                                 ----------
TOTAL SALARIES AND WAGES               0.00   248420.06   257964.00     9543.93 


STAFF BENEFITS at 0.192                0.00    48615.77    57346.00     8730.22 


CAPITAL EXPENDITURES
  ZENITH-TERMINAL                    756.15 
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES       756.15    39709.69    17405.00    22304.69-


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00     7148.94    13200.00     6051.06 


EXPENDABLE MATERIALS
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS         0.00    47208.94    34365.00    12843.94-


INDIRECT COSTS at 0.58                 0.00   205608.47   219720.00    14111.52 

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                          756.15   596711.88   600000.00     3288.11 
Projection for NSF78 for the month 04/81

Prepared by BIS using BUDGET on 02/06/81 at 02:31:12

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
                                 ----------
TOTAL SALARIES AND WAGES               0.00   248420.06   257964.00     9543.93 


STAFF BENEFITS at 0.192                0.00    48615.77    57346.00     8730.22 


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00    39709.69    17405.00    22304.69-


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00     7148.94    13200.00     6051.06 


EXPENDABLE MATERIALS
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS         0.00    47208.94    34365.00    12843.94-


INDIRECT COSTS at 0.58                 0.00   205608.47   219720.00    14111.52 

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                            0.00   596711.88   600000.00     3288.11 
Projection for NSF78 for the month 05/81

Prepared by BIS using BUDGET on 02/06/81 at 02:31:12

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
                                 ----------
TOTAL SALARIES AND WAGES               0.00   248420.06   257964.00     9543.93 


STAFF BENEFITS at 0.192                0.00    48615.77    57346.00     8730.22 


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00    39709.69    17405.00    22304.69-


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00     7148.94    13200.00     6051.06 


EXPENDABLE MATERIALS
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS         0.00    47208.94    34365.00    12843.94-


INDIRECT COSTS at 0.58                 0.00   205608.47   219720.00    14111.52 

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                            0.00   596711.88   600000.00     3288.11 
Projection for NSF78 for the month 06/81

Prepared by BIS using BUDGET on 02/06/81 at 02:31:13

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
                                 ----------
TOTAL SALARIES AND WAGES               0.00   248420.06   257964.00     9543.93 


STAFF BENEFITS at 0.192                0.00    48615.77    57346.00     8730.22 


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00    39709.69    17405.00    22304.69-


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00     7148.94    13200.00     6051.06 


EXPENDABLE MATERIALS
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS         0.00    47208.94    34365.00    12843.94-


INDIRECT COSTS at 0.58                 0.00   205608.47   219720.00    14111.52 

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                            0.00   596711.88   600000.00     3288.11 
Projection for NSF78 for the month 07/81

Prepared by BIS using BUDGET on 02/06/81 at 02:31:13

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
                                 ----------
TOTAL SALARIES AND WAGES               0.00   248420.06   257964.00     9543.93 


STAFF BENEFITS at 0.192                0.00    48615.77    57346.00     8730.22 


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00    39709.69    17405.00    22304.69-


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00     7148.94    13200.00     6051.06 


EXPENDABLE MATERIALS
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS         0.00    47208.94    34365.00    12843.94-


INDIRECT COSTS at 0.58                 0.00   205608.47   219720.00    14111.52 

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                            0.00   596711.88   600000.00     3288.11 
Projection for NSF78 for the month 08/81

Prepared by BIS using BUDGET on 02/06/81 at 02:31:14

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
                                 ----------
TOTAL SALARIES AND WAGES               0.00   248420.06   257964.00     9543.93 


STAFF BENEFITS at 0.192                0.00    48615.77    57346.00     8730.22 


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00    39709.69    17405.00    22304.69-


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00     7148.94    13200.00     6051.06 


EXPENDABLE MATERIALS
                                 ---------$4~∃)∨Qβ_A
=$A1A≥	β	→
A≠¬)%∪¬→&@@@@@@@`\`@@@@@Pnd`p8rh@@@fhfXj\``@@@bHphf\dhZ~∀4∀~∃∪9	∪%
(Aπ∨M)&ACP@`\j`@@@@@@@@@@@@@@`\@`@@@H`jl``\hn@@dbr\d`\`@@@@@Dhbbb8jd@~(~∀@@@@@@@@@@@@@@@@@@@@@@@@@@ZZZZ4ZZZZ4@@@Z4ZZZZ4ZZ@@ZZZZ4ZZZZ@@ZZ4ZZZZ4Z~∃)=)β_A
∨')&@@@@@@@@@@@@@@@@@A↓↓α↓↓↓As↓A↓↓β)eY]	9aaα↓↓YAβ↓AA9β↓↓↓↓α↓MIaBqEEhP2CK}S↔∂SN{9β≠␈⊃α:N39aβ≠␈⊃βS#*β7?;&A↓Ae{AD4(hRCK↔εK↔⊃ε∪eα
M→βWONs≥α
,"≡⊗Qε{9↓A∩yAY=C	βπQβ↓IiMQEP4Ph)↓↓α↓↓↓↓α↓↓↓↓α↓↓↓↓α↓↓↓↓α↓↓↓↓α↓↓↓↓ααS#'~α7?;&A↓↓↓¬#=α∪∂#∃↓↓∧∪W∪∨/#↔⊃↓¬∪↔7πNs';≤hQ↓↓↓α↓↓↓↓α↓↓↓↓α↓↓↓↓α↓↓↓↓α↓↓↓↓α↓↓↓↓αi555ji555j↓↓↓↓ji555ji↓↓↓ji555ji5↓↓ji555ji544Ph*Nεd
J&⊗~αε:⊃¬:ε≡⊗_h)↓↓α↓↓↓↓α↓↓↓↓α↓↓↓↓α↓↓↓↓α↓↓↓↓α↓↓↓↓αi555ji555hh*R>$
1αNbεJ&-→αε:"α↑ε≡-→↓↓↓α↓↓↓↓α↓↓↓↓α↓A9Aα↓↓↓I#AQIAs↓Y↓↓β⊃U]e3!9AAα↓↓↓↓K)QM9K→4(hP4*N$
~→α∀*:⊗~M"Mβπ"↓A9I⊃↓↓↓α↓↓↓↓α↓↓↓↓α↓↓A9β↓↓↓↓β!aYE*q]]↓α↓↓U]≠!Y9Aα↓↓↓↓βA]MAs⊃I4Ph(4*≤
B&Raα⊗b∧*:∩&%*J⊗LhQ↓↓↓α↓↓↓↓α↓↓↓↓α↓↓↓↓α↓↓↓↓α↓↓↓↓α↓↓↓↓ji555ji554hRR>Raα~>∩α∞εBM"ε1α-BB⊗:$JRVJ-→↓↓↓α↓↓↓↓β↓9AAα↓↓↓MK9Ae93I↓↓↓β	]QA*qAA↓α↓↓II≠↓Q9YJh4(4Ph*RJ
2⊗04R↓↓↓↓α↓↓↓↓α↓↓↓↓α↓↓↓↓α↓↓↓↓α↓↓↓↓α↓↓↓5ji555ji544U">Rεbα~>I¬"JεZ,a↓↓↓α↓↓↓↓α↓↓↓↓α↓↓↓↓α↓↓↓↓αqAA↓α↓↓↓]!a9e"↓↓↓↓→IAAs↓A↓↓α↓↓YA+	9AYh(4(hR⊗bB,r∩ε
d)α6ε$*J&εe_4)↓α↓↓↓↓α↓↓↓↓α↓↓↓↓α↓↓↓↓α↓↓↓↓α↓↓↓↓α↓555ji555jh4*R⎇"ε1α4zIα⊗Eα⊗:∩∩2∃αl
R⊗JL
2M↓α↓↓↓↓α↓↓A9β↓↓↓↓β!]IABqeQ↓α↓↓MQ≠1U9Aα↓↓↓↓⊃aQMsIQ44Ph(4*Lr∩&J,~Qα∞⎇~RMβ∂!↓A9+A↓↓↓α↓↓↓↓α↓↓↓↓α↓↓↓As↓A↓↓β⊃AUYβA9Q]α↓↓IEK9IA9β↓↓↓↓β	QEE
qUIhP4)↓α↓↓↓↓α↓↓↓↓α↓↓↓↓α↓↓↓↓α↓↓↓↓α↓↓↓↓α↓555ji555ji↓↓↓ji555ji55↓α↓555ji555j↓↓↓5ji555ji44*$zRε1∧~>NR~↓↓↓↓α↓↓↓↓α↓↓↓↓α↓↓↓↓α↓↓↓↓α↓↓↓As↓A↓↓β)eY]	9aaα↓↓YAβ↓AA9β↓↓↓↓α↓MIaBqEEhP2OWnkπKeε{→α:≤1]aβ↔Iβ7?w#!βJβ↔cC.s∪'S/∪∃βSOβ∃84Ph)↓↓α↓↓↓↓αβOπ3∂∪e↓↓α↓↓↓↓α↓↓↓↓α↓↓↓↓α↓↓↓↓α↓↓↓↓α↓↓↓↓α↓↓↓↓α↓↓↓↓αβS?S∞`4)↓α↓↓↓↓α↓↓β←∞;↔M↓αβ∂πCO#π1↓α↓↓↓↓α↓↓↓β/CC↔;&3∃αβ';∪O∪↔∂Qα↓↓βSFKM↓↓αβπ3∞s∂∀4Vk?;SB↓β↔v+≠'S~↓↓↓β/W'Aα↓↓↓β'∪π[↔b↓β7π&+K'πg→↓↓↓ε≠?OS~↓↓↓βn{;S!α↓βK↔n';'v84)5ji55↓αi555ji55↓α↓555ji55↓α↓↓55ji55↓ji555ji555α↓555ji555α↓↓55ji5↓↓αi555ji554hP4)A
yaE↓α↓↓↓↓KIU↓↓α↓↓↓MC⊃A↓↓α↓↓↓↓∪	I↓↓α↓↓↓E;1M↓↓α↓↓↓E;⊃M↓↓α↓↓↓a+	Q↓↓α↓↓E]≠↓]4S↓I=a
↓↓↓↓β⊃QIaα↓↓↓↓βAAAQα↓↓↓↓α↓↓↓Aα↓↓↓↓α↓eAAα↓↓↓↓β	eMAα↓↓↓↓→IYMα↓↓↓↓β!AQQh)AM{AE↓↓α↓↓↓↓β↓↓↓↓α↓↓↓]+1↓↓↓α↓↓↓↓β↓↓↓↓α↓↓↓↓β↓↓↓↓α↓↓↓↓β↓↓↓↓α↓↓↓]+1↓↓↓ 3288 
04/81        0         0         0         0         0         0      3288 
05/81        0         0         0         0         0         0      3288 
06/81        0         0         0         0         0         0      3288 
07/81        0         0         0         0         0         0      3288 
08/81        0         0         0         0         0         0      3288 
09/81        0         0         0         0         0         0      3288 
Grant status for NSF81 at the end of 12/80

                                     To Date   Budgeted  Remaining
                                     -------   --------  ---------
SALARIES AND WAGES                      0.00  200000.00  200000.00

STAFF BENEFITS                          0.00       0.00       0.00

CAPITAL EXPENDITURES                    0.00       0.00       0.00

TRAVEL                                  0.00       0.00       0.00

EXPENDABLE MATERIALS                    0.00       0.00       0.00

INDIRECT COSTS                          0.00       0.00       0.00

TOTAL                                   0.00  200000.00  200000.00
Projection for NSF81 for the month 01/81

Prepared by BIS using BUDGET on 02/06/81 at 02:31:15

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
                                 ----------
TOTAL SALARIES AND WAGES               0.00        0.00   200000.00   200000.00 


STAFF BENEFITS at 0.192                0.00        0.00        0.00        0.00 


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00        0.00        0.00        0.00 


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00        0.00        0.00        0.00 


EXPENDABLE MATERIALS
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS         0.00        0.00        0.00        0.00 


INDIRECT COSTS at 0.58                 0.00        0.00        0.00        0.00 

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                            0.00        0.00   200000.00   200000.00 
Projection for NSF81 for the month 02/81

Prepared by BIS using BUDGET on 02/06/81 at 02:31:16

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 SALISBURY    0 %of    1202.00         0.00 
                                 ----------
TOTAL SALARIES AND WAGES               0.00        0.00   200000.00   200000.00 


STAFF BENEFITS at 0.192                0.00        0.00        0.00        0.00 


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00        0.00        0.00        0.00 


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00        0.00        0.00        0.00 


EXPENDABLE MATERIALS
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS         0.00        0.00        0.00        0.00 


INDIRECT COSTS at 0.58                 0.00        0.00        0.00        0.00 

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                            0.00        0.00   200000.00   200000.00 
Projection for NSF81 for the month 03/81

Prepared by BIS using BUDGET on 02/06/81 at 02:31:16

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 BINFORD     50 %of    3083.00      1541.50 
 CRAIG       50 %of    1114.00       557.00 
 GOLDMAN     50 %of    1202.00       601.00 
 MAPLES      25 %of    1114.00       278.50 
 MUJTABA     50 %of    1202.00       601.00 
 SALISBURY    0 %of    1202.00         0.00 
 SIROKER     50 %of    1214.00       607.00 
 SOROKA      75 %of    2083.00      1562.25 
                                 ----------
TOTAL SALARIES AND WAGES            5748.25     5748.25   200000.00   194251.75 


STAFF BENEFITS at 0.192             1103.66     1103.66        0.00     1103.66-


CAPITAL EXPENDITURES
  VM                               10650.00 
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES     10650.00    10650.00        0.00    10650.00-


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00        0.00        0.00        0.00 


EXPENDABLE MATERIALS
  FORCE-WRIST                       3300.00 
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS      3300.00     3300.00        0.00     3300.00-


INDIRECT COSTS at 0.58              5888.11     5888.11        0.00     5888.11-

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                        26690.02    26690.02   200000.00   173309.97 
Projection for NSF81 for the month 04/81

Prepared by BIS using BUDGET on 02/06/81 at 02:31:16

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 BINFORD     50 %of    3083.00      1541.50 
 CRAIG       50 %of    1114.00       557.00 
 GOLDMAN     50 %of    1202.00       601.00 
 MAPLES      25 %of    1114.00       278.50 
 MUJTABA     50 %of    1202.00       601.00 
 SALISBURY    0 %of    1202.00         0.00 
 SIROKER     50 %of    1214.00       607.00 
 SOROKA      75 %of    2083.00      1562.25 
                                 ----------
TOTAL SALARIES AND WAGES            5748.25    11496.50   200000.00   188503.50 


STAFF BENEFITS at 0.192             1103.66     2207.32        0.00     2207.32-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00    10650.00        0.00    10650.00-


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00        0.00        0.00        0.00 


EXPENDABLE MATERIALS
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS         0.00     3300.00        0.00     3300.00-


INDIRECT COSTS at 0.58              3974.11     9862.22        0.00     9862.22-

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                        10826.02    37516.04   200000.00   162483.95 
Projection for NSF81 for the month 05/81

Prepared by BIS using BUDGET on 02/06/81 at 02:31:17

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 BINFORD     50 %of    3083.00      1541.50 
 CRAIG       50 %of    1114.00       557.00 
 GOLDMAN     50 %of    1202.00       601.00 
 MAPLES      25 %of    1114.00       278.50 
 MUJTABA     50 %of    1202.00       601.00 
 SALISBURY    0 %of    1202.00         0.00 
 SIROKER     50 %of    1214.00       607.00 
 SOROKA      75 %of    2083.00      1562.25 
                                 ----------
TOTAL SALARIES AND WAGES            5748.25    17244.75   200000.00   182755.25 


STAFF BENEFITS at 0.192             1103.66     3310.99        0.00     3310.99-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00    10650.00        0.00    10650.00-


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00        0.00        0.00        0.00 


EXPENDABLE MATERIALS
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS         0.00     3300.00        0.00     3300.00-


INDIRECT COSTS at 0.58              3974.11    13836.33        0.00    13836.33-

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                        10826.02    48342.07   200000.00   151657.92 
Projection for NSF81 for the month 06/81

Prepared by BIS using BUDGET on 02/06/81 at 02:31:17

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 BINFORD     50 %of    3083.00      1541.50 
 CRAIG       50 %of    1114.00       557.00 
 GOLDMAN     50 %of    1202.00       601.00 
 MAPLES      25 %of    1114.00       278.50 
 MUJTABA     50 %of    1202.00       601.00 
 SALISBURY    0 %of    1202.00         0.00 
 SIROKER     50 %of    1214.00       607.00 
 SOROKA      75 %of    2083.00      1562.25 
                                 ----------
TOTAL SALARIES AND WAGES            5748.25    22993.00   200000.00   177007.00 


STAFF BENEFITS at 0.192             1103.66     4414.65        0.00     4414.65-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00    10650.00        0.00    10650.00-


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00        0.00        0.00        0.00 


EXPENDABLE MATERIALS
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS         0.00     3300.00        0.00     3300.00-


INDIRECT COSTS at 0.58              3974.11    17810.44        0.00    17810.44-

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                        10826.02    59168.09   200000.00   140831.90 
Projection for NSF81 for the month 07/81

Prepared by BIS using BUDGET on 02/06/81 at 02:31:18

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 BINFORD     50 %of    3083.00      1541.50 
 CRAIG      100 %of    1114.00      1114.00 
 GOLDMAN    100 %of    1202.00      1202.00 
 MAPLES     100 %of    1114.00      1114.00 
 SIROKER     50 %of    1214.00       607.00 
 SOROKA      75 %of    2083.00      1562.25 
                                 ----------
TOTAL SALARIES AND WAGES            7140.75    30133.75   200000.00   169866.25 


STAFF BENEFITS at 0.192             1371.02     5785.68        0.00     5785.68-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00    10650.00        0.00    10650.00-


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00        0.00        0.00        0.00 


EXPENDABLE MATERIALS
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS         0.00     3300.00        0.00     3300.00-


INDIRECT COSTS at 0.58              4936.82    22747.26        0.00    22747.26-

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                        13448.60    72616.70   200000.00   127383.30 
Projection for NSF81 for the month 08/81

Prepared by BIS using BUDGET on 02/06/81 at 02:31:18

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 BINFORD     50 %of    3083.00      1541.50 
 CRAIG      100 %of    1114.00      1114.00 
 GOLDMAN    100 %of    1202.00      1202.00 
 MAPLES     100 %of    1114.00      1114.00 
 SIROKER     50 %of    1214.00       607.00 
 SOROKA      75 %of    2083.00      1562.25 
                                 ----------
TOTAL SALARIES AND WAGES            7140.75    37274.50   200000.00   162725.50 


STAFF BENEFITS at 0.192             1371.02     7156.70        0.00     7156.70-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00    10650.00        0.00    10650.00-


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00        0.00        0.00        0.00 


EXPENDABLE MATERIALS
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS         0.00     3300.00        0.00     3300.00-


INDIRECT COSTS at 0.58              4936.82    27684.09        0.00    27684.09-

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                        13448.60    86065.30   200000.00   113934.69 
Projection for NSF81 for the month 09/81

Prepared by BIS using BUDGET on 02/06/81 at 02:31:19

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 BINFORD     50 %of    3391.30      1695.65 
 CRAIG      100 %of    1114.00      1114.00 
 GOLDMAN    100 %of    1202.00      1202.00 
 MAPLES     100 %of    1114.00      1114.00 
 SIROKER     50 %of    1318.90       659.45 
 SOROKA      75 %of    2291.30      1718.47 
                                 ----------
TOTAL SALARIES AND WAGES            7503.57    44778.07   200000.00   155221.92 


STAFF BENEFITS at 0.212             1590.75     8747.46        0.00     8747.46-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00    10650.00        0.00    10650.00-


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00        0.00        0.00        0.00 


EXPENDABLE MATERIALS
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS         0.00     3300.00        0.00     3300.00-


INDIRECT COSTS at 0.58              5274.71    32958.81        0.00    32958.81-

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                        14369.04   100434.34   200000.00    99565.65 
Summary of NSF81 by month by expenditure type.

         salary                                            total
          wages   capital           expendable  indirect    this    balance
month  benefits    equip     travel  materials    costs    month   remaining
-----  --------   -------    ------ ----------  --------   -----   ---------

01/81        0         0         0         0         0         0    200000 
02/81        0         0         0         0         0         0    200000 
03/81     6851     10650         0      3300      5888     26690    173309 
04/81     6851         0         0         0      3974     10826    162483 
05/81     6851         0         0         0      3974     10826    151657 
06/81     6851         0         0         0      3974     10826    140831 
07/81     8511         0         0         0      4936     13448    127383 
08/81     8511         0         0         0      4936     13448    113934 
09/81     9094         0         0         0      5274     14369     99565 
Grant status for SRI at the end of 12/80

                                     To Date   Budgeted  Remaining
                                     -------   --------  ---------
SALARIES AND WAGES                  13154.00   50000.00   36846.00

STAFF BENEFITS                       2525.57       0.00    2525.57-

CAPITAL EXPENDITURES                    0.00       0.00       0.00

TRAVEL                                  0.00       0.00       0.00

EXPENDABLE MATERIALS                   65.75       0.00      65.75-

INDIRECT COSTS                       9132.29       0.00    9132.29-

TOTAL                               24877.61   50000.00   25122.39
Projection for SRI for the month 01/81

Prepared by BIS using BUDGET on 02/06/81 at 02:31:21

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 ARNOLD     100 %of    1202.00      1202.00 
 BAKER      100 %of    1560.00      1560.00 
 BINFORD     70 %of    3083.00      2158.10 
 HOCHSCHILD  50 %of    1114.00       557.00 
 LIEBES      30 %of    3041.00       912.30 
                                 ----------
TOTAL SALARIES AND WAGES            6389.40    19543.40    50000.00    30456.59 


STAFF BENEFITS at 0.192             1226.76     3752.33        0.00     3752.33-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00        0.00        0.00        0.00 


TRAVEL
  BUFFALO-47303                      947.87 
                                 ----------
TOTAL FOR TRAVEL                     947.87      947.87        0.00      947.87-


EXPENDABLE MATERIALS
  EXPENDABLE-MATERIALS                65.75 
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS        65.75      131.50        0.00      131.50-


INDIRECT COSTS at 0.58              5005.27    14137.56        0.00    14137.56-

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                        13635.06    38512.67    50000.00    11487.32 
Projection for SRI for the month 02/81

Prepared by BIS using BUDGET on 02/06/81 at 02:31:22

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 ARNOLD      50 %of    1202.00       601.00 
 BAKER       50 %of    1560.00       780.00 
 BINFORD     70 %of    3083.00      2158.10 
 HOCHSCHILD  25 %of    1114.00       278.50 
 LIEBES      69 %of    3041.00      2098.28 
 SIROKER     10 %of    1214.00       121.40 
                                 ----------
TOTAL SALARIES AND WAGES            6037.29    25580.69    50000.00    24419.30 


STAFF BENEFITS at 0.192             1159.15     4911.49        0.00     4911.49-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00        0.00        0.00        0.00 


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00      947.87        0.00      947.87-


EXPENDABLE MATERIALS
  EXPENDABLE-MATERIALS                65.75 
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS        65.75      197.25        0.00      197.25-


INDIRECT COSTS at 0.58              4212.07    18349.64        0.00    18349.64-

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                        11474.27    49986.94    50000.00       13.05 
Projection for SRI for the month 03/81

Prepared by BIS using BUDGET on 02/06/81 at 02:31:22

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
                                 ----------
TOTAL SALARIES AND WAGES               0.00    25580.69    50000.00    24419.30 


STAFF BENEFITS at 0.192                0.00     4911.49        0.00     4911.49-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00        0.00        0.00        0.00 


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00      947.87        0.00      947.87-


EXPENDABLE MATERIALS
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS         0.00      197.25        0.00      197.25-


INDIRECT COSTS at 0.58                 0.00    18349.64        0.00    18349.64-

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                            0.00    49986.94    50000.00       13.05 
Projection for SRI for the month 04/81

Prepared by BIS using BUDGET on 02/06/81 at 02:31:22

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
                                 ----------
TOTAL SALARIES AND WAGES               0.00    25580.69    50000.00    24419.30 


STAFF BENEFITS at 0.192                0.00     4911.49        0.00     4911.49-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00        0.00        0.00        0.00 


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00      947.87        0.00      947.87-


EXPENDABLE MATERIALS
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS         0.00      197.25        0.00      197.25-


INDIRECT COSTS at 0.58                 0.00    18349.64        0.00    18349.64-

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                            0.00    49986.94    50000.00       13.05 
Projection for SRI for the month 05/81

Prepared by BIS using BUDGET on 02/06/81 at 02:31:23

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
                                 ----------
TOTAL SALARIES AND WAGES               0.00    25580.69    50000.00    24419.30 


STAFF BENEFITS at 0.192                0.00     4911.49        0.00     4911.49-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00        0.00        0.00        0.00 


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00      947.87        0.00      947.87-


EXPENDABLE MATERIALS
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS         0.00      197.25        0.00      197.25-


INDIRECT COSTS at 0.58                 0.00    18349.64        0.00    18349.64-

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                            0.00    49986.94    50000.00       13.05 
Projection for SRI for the month 06/81

Prepared by BIS using BUDGET on 02/06/81 at 02:31:23

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
                                 ----------
TOTAL SALARIES AND WAGES               0.00    25580.69    50000.00    24419.30 


STAFF BENEFITS at 0.192                0.00     4911.49        0.00     4911.49-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00        0.00        0.00        0.00 


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00      947.87        0.00      947.87-


EXPENDABLE MATERIALS
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS         0.00      197.25        0.00      197.25-


INDIRECT COSTS at 0.58                 0.00    18349.64        0.00    18349.64-

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                            0.00    49986.94    50000.00       13.05 
Projection for SRI for the month 07/81

Prepared by BIS using BUDGET on 02/06/81 at 02:31:24

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
                                 ----------
TOTAL SALARIES AND WAGES               0.00    25580.69    50000.00    24419.30 


STAFF BENEFITS at 0.192                0.00     4911.49        0.00     4911.49-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00        0.00        0.00        0.00 


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00      947.87        0.00      947.87-


EXPENDABLE MATERIALS
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS         0.00      197.25        0.00      197.25-


INDIRECT COSTS at 0.58                 0.00    18349.64        0.00    18349.64-

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                            0.00    49986.94    50000.00       13.05 
Projection for SRI for the month 08/81

Prepared by BIS using BUDGET on 02/06/81 at 02:31:24

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
                                 ----------
TOTAL SALARIES AND WAGES               0.00    25580.69    50000.00    24419.30 


STAFF BENEFITS at 0.192                0.00     4911.49        0.00     4911.49-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00        0.00        0.00        0.00 


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00      947.87        0.00      947.87-


EXPENDABLE MATERIALS
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS         0.00      197.25        0.00      197.25-


INDIRECT COSTS at 0.58                 0.00    18349.64        0.00    18349.64-

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                            0.00    49986.94    50000.00       13.05 
Projection for SRI for the month 09/81

Prepared by BIS using BUDGET on 02/06/81 at 02:31:24

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
                                 ----------
TOTAL SALARIES AND WAGES               0.00    25580.69    50000.00    24419.30 


STAFF BENEFITS at 0.212                0.00     4911.49        0.00     4911.49-


CAPITAL EXPENDITURES
                                 ----------
TOTAL FOR CAPITAL EXPENDITURES         0.00        0.00        0.00        0.00 


TRAVEL
                                 ----------
TOTAL FOR TRAVEL                       0.00      947.87        0.00      947.87-


EXPENDABLE MATERIALS
                                 ----------
TOTAL FOR EXPENDABLE MATERIALS         0.00      197.25        0.00      197.25-


INDIRECT COSTS at 0.58                 0.00    18349.64        0.00    18349.64-

                                 ----------   ---------   ---------   ---------
TOTAL COSTS                            0.00    49986.94    50000.00       13.05 
Summary of SRI by month by expenditure type.

         salary                                            total
          wages   capital           expendable  indirect    this    balance
month  benefits    equip     travel  materials    costs    month   remaining
-----  --------   -------    ------ ----------  --------   -----   ---------

01/81     7616         0       947        65      5005     13635     11487 
02/81     7196         0         0        65      4212     11474        13 
03/81        0         0         0         0         0         0        13 
04/81        0         0         0         0         0         0        13 
05/81        0         0         0         0         0         0        13 
06/81        0         0         0         0         0         0        13 
07/81        0         0         0         0         0         0        13 
08/81        0         0         0         0         0         0        13 
09/81        0         0         0         0         0         0        13 
Summary of ARNOLD on all grants from 01/81 thru 09/81

                      %        %         %
month     salary     ARPA     SRI      total
-----     ------     ------   ------   -----
01/81    1202.00      50-     100        50 
02/81    1202.00       0       50        50 
03/81    1202.00      50        0        50 
04/81    1202.00      50        0        50 
05/81    1202.00      50        0        50 
06/81    1202.00      50        0        50 
07/81    1202.00     100        0       100 
08/81    1202.00     100        0       100 
09/81    1202.00     100        0       100 
Summary of BAKER on all grants from 01/81 thru 09/81

                      %        %         %
month     salary     ARPA     SRI      total
-----     ------     ------   ------   -----
01/81    1560.00      50-     100        50 
02/81    1560.00       0       50        50 
03/81    1560.00      50        0        50 
04/81    1560.00      50        0        50 
05/81    1560.00      50        0        50 
06/81    1560.00      50        0        50 
07/81    1560.00     100        0       100 
08/81    1560.00     100        0       100 
09/81    1715.99     100        0       100 
Summary of BINFORD on all grants from 01/81 thru 09/81

                      %        %        %         %
month     salary     ARPA     NSF81    SRI      total
-----     ------     ------   ------   ------   -----
01/81    3083.00      30        0       70       100 
02/81    3083.00      30        0       70       100 
03/81    3083.00      50       50        0       100 
04/81    3083.00      50       50        0       100 
05/81    3083.00      50       50        0       100 
06/81    3083.00      50       50        0       100 
07/81    3083.00      50       50        0       100 
08/81    3083.00      50       50        0       100 
09/81    3391.30      50       50        0       100 
Summary of BLICHER on all grants from 01/81 thru 09/81

                      %         %
month     salary     ARPA     total
-----     ------     ------   -----
01/81    1560.00      50        50 
02/81    1560.00      50        50 
03/81    1560.00      50        50 
04/81    1560.00      50        50 
05/81    1560.00      50        50 
06/81    1560.00      50        50 
07/81    1560.00     100       100 
08/81    1560.00     100       100 
09/81    1715.99     100       100 
Summary of BROOKS on all grants from 01/81 thru 09/81

                      %         %
month     salary     ARPA     total
-----     ------     ------   -----
01/81    1202.00      50        50 
02/81    1202.00      50        50 
03/81    1202.00      50        50 
04/81    1202.00      50        50 
05/81    1202.00      50        50 
06/81    1202.00      50        50 
07/81    1202.00       0         0 
08/81    1202.00       0         0 
09/81    1202.00       0         0 
Summary of CLARKSON on all grants from 01/81 thru 09/81

                      %         %
month     salary     ARPA     total
-----     ------     ------   -----
01/81    1114.00      25        25 
02/81    1114.00      25        25 
03/81    1114.00      25        25 
04/81    1114.00      25        25 
05/81    1114.00      25        25 
06/81    1114.00      25        25 
07/81    1114.00     100       100 
08/81    1114.00     100       100 
09/81    1114.00     100       100 
Summary of CRAIG on all grants from 01/81 thru 09/81

                      %        %         %
month     salary     NSF78    NSF81    total
-----     ------     ------   ------   -----
01/81    1114.00      50        0        50 
02/81    1114.00      50        0        50 
03/81    1114.00       0       50        50 
04/81    1114.00       0       50        50 
05/81    1114.00       0       50        50 
06/81    1114.00       0       50        50 
07/81    1114.00       0      100       100 
08/81    1114.00       0      100       100 
09/81    1114.00       0      100       100 
Summary of GHOSH on all grants from 01/81 thru 09/81

                      %         %
month     salary     ARPA     total
-----     ------     ------   -----
01/81    1114.00      50        50 
02/81    1114.00      50        50 
03/81    1114.00      50        50 
04/81    1114.00      50        50 
05/81    1114.00      50        50 
06/81    1114.00      50        50 
07/81    1114.00     100       100 
08/81    1114.00     100       100 
09/81    1114.00     100       100 
Summary of GOLDMAN on all grants from 01/81 thru 09/81

                      %        %         %
month     salary     NSF78    NSF81    total
-----     ------     ------   ------   -----
01/81    1202.00      50        0        50 
02/81    1202.00      50        0        50 
03/81    1202.00       0       50        50 
04/81    1202.00       0       50        50 
05/81    1202.00       0       50        50 
06/81    1202.00       0       50        50 
07/81    1202.00       0      100       100 
08/81    1202.00       0      100       100 
09/81    1202.00       0      100       100 
Summary of HOCHSCHILD on all grants from 01/81 thru 09/81

                      %        %         %
month     salary     ARPA     SRI      total
-----     ------     ------   ------   -----
01/81    1114.00      25-      50        25 
02/81    1114.00       0       25        25 
03/81    1114.00      25        0        25 
04/81    1114.00      25        0        25 
05/81    1114.00      25        0        25 
06/81    1114.00      25        0        25 
07/81    1114.00     100        0       100 
08/81    1114.00     100        0       100 
09/81    1114.00     100        0       100 
Summary of L-CHRISTOPHER on all grants from 01/81 thru 09/81

                      %         %
month     salary     GM       total
-----     ------     ------   -----
01/81     227.21     100-      100-
02/81     227.21       0         0 
03/81     227.21       0         0 
04/81     227.21       0         0 
05/81     227.21       0         0 
06/81     227.21       0         0 
07/81     227.21       0         0 
08/81     227.21       0         0 
09/81     227.21       0         0 
Summary of LIEBES on all grants from 01/81 thru 09/81

                      %        %        %         %
month     salary     ARPA     NASA     SRI      total
-----     ------     ------   ------   ------   -----
01/81    3041.00       0       70       30       100 
02/81    3041.00       0       31       69       100 
03/81    3041.00       0      100        0       100 
04/81    3041.00       0      100        0       100 
05/81    3041.00      19       81        0       100 
06/81    3041.00     100        0        0       100 
07/81    3041.00     100        0        0       100 
08/81    3041.00     100        0        0       100 
09/81    3345.09     100        0        0       100 
Summary of LOWE on all grants from 01/81 thru 09/81

                      %         %
month     salary     ARPA     total
-----     ------     ------   -----
01/81    1202.00      35        35 
02/81    1202.00      35        35 
03/81    1202.00      35        35 
04/81    1202.00      35        35 
05/81    1202.00      35        35 
06/81    1202.00      35        35 
07/81    1202.00     100       100 
08/81    1202.00     100       100 
09/81    1202.00     100       100 
Summary of LOWRY on all grants from 01/81 thru 09/81

                      %         %
month     salary     ARPA     total
-----     ------     ------   -----
01/81    1202.00      25        25 
02/81    1202.00      25        25 
03/81    1202.00      25        25 
04/81    1202.00      50        50 
05/81    1202.00      50        50 
06/81    1202.00      50        50 
07/81    1202.00     100       100 
08/81    1202.00     100       100 
09/81    1202.00     100       100 
Summary of MAPLES on all grants from 01/81 thru 09/81

                      %        %         %
month     salary     NSF78    NSF81    total
-----     ------     ------   ------   -----
01/81    1114.00      25        0        25 
02/81    1114.00      25        0        25 
03/81    1114.00       0       25        25 
04/81    1114.00       0       25        25 
05/81    1114.00       0       25        25 
06/81    1114.00       0       25        25 
07/81    1114.00       0      100       100 
08/81    1114.00       0      100       100 
09/81    1114.00       0      100       100 
Summary of MARIMONT on all grants from 01/81 thru 09/81

                      %         %
month     salary     ARPA     total
-----     ------     ------   -----
01/81    1114.00      50        50 
02/81    1114.00      50        50 
03/81    1114.00      50        50 
04/81    1114.00      50        50 
05/81    1114.00      50        50 
06/81    1114.00      50        50 
07/81    1114.00     100       100 
08/81    1114.00     100       100 
09/81    1114.00     100       100 
Summary of MILLER on all grants from 01/81 thru 09/81

                      %         %
month     salary     ARPA     total
-----     ------     ------   -----
01/81    1202.00      50        50 
02/81    1202.00      50        50 
03/81    1202.00      50        50 
04/81    1202.00      50        50 
05/81    1202.00      50        50 
06/81    1202.00      50        50 
07/81    1202.00     100       100 
08/81    1202.00     100       100 
09/81    1202.00     100       100 
Summary of MUJTABA on all grants from 01/81 thru 09/81

                      %        %         %
month     salary     NSF78    NSF81    total
-----     ------     ------   ------   -----
01/81    1202.00      50        0        50 
02/81    1202.00      50        0        50 
03/81    1202.00       0       50        50 
04/81    1202.00       0       50        50 
05/81    1202.00       0       50        50 
06/81    1202.00       0       50        50 
07/81    1202.00       0        0         0 
08/81    1202.00       0        0         0 
09/81    1202.00       0        0         0 
Summary of RUTENBURG on all grants from 01/81 thru 09/81

                      %         %
month     salary     ARPA     total
-----     ------     ------   -----
01/81    1114.00      50        50 
02/81    1114.00      50        50 
03/81    1114.00      50        50 
04/81    1114.00      50        50 
05/81    1114.00      50        50 
06/81    1114.00      50        50 
07/81    1114.00     100       100 
08/81    1114.00     100       100 
09/81    1114.00     100       100 
Summary of SALISBURY on all grants from 01/81 thru 09/81

                      %        %         %
month     salary     NSF78    NSF81    total
-----     ------     ------   ------   -----
01/81    1202.00     100-       0       100-
02/81    1202.00       0        0         0 
03/81    1202.00       0        0         0 
04/81    1202.00       0        0         0 
05/81    1202.00       0        0         0 
06/81    1202.00       0        0         0 
07/81    1202.00       0        0         0 
08/81    1202.00       0        0         0 
09/81    1202.00       0        0         0 
Summary of SCHWETZ on all grants from 01/81 thru 09/81

                      %         %
month     salary     ARPA     total
-----     ------     ------   -----
01/81    1039.98       3         3 
02/81    1039.98      65        65 
03/81    1039.98       0         0 
04/81    1039.98       0         0 
05/81    1039.98       0         0 
06/81    1039.98       0         0 
07/81    1039.98       0         0 
08/81    1039.98       0         0 
09/81    1143.97       0         0 
Summary of SIROKER on all grants from 01/81 thru 09/81

                      %        %        %        %         %
month     salary     ARPA     CONF81   NSF81    SRI      total
-----     ------     ------   ------   ------   ------   -----
01/81    1214.00       0      100        0        0       100 
02/81    1214.00      20       70        0       10       100 
03/81    1214.00      50        0       50        0       100 
04/81    1214.00      50        0       50        0       100 
05/81    1214.00      50        0       50        0       100 
06/81    1214.00      50        0       50        0       100 
07/81    1214.00      50        0       50        0       100 
08/81    1214.00      50        0       50        0       100 
09/81    1318.90      50        0       50        0       100 
Summary of SOROKA on all grants from 01/81 thru 09/81

                      %        %        %        %         %
month     salary     ALCOA    ARPA     GM       NSF81    total
-----     ------     ------   ------   ------   ------   -----
01/81    2083.00      40       25       35        0       100 
02/81    2083.00      40       25       35        0       100 
03/81    2083.00       0       25        0       75       100 
04/81    2083.00       0       25        0       75       100 
05/81    2083.00       0       25        0       75       100 
06/81    2083.00       0       25        0       75       100 
07/81    2083.00       0       25        0       75       100 
08/81    2083.00       0       25        0       75       100 
09/81    2291.30       0       25        0       75       100 
Summary of CAPITAL-EQUIPMENT by month by grant.

month  ALCOA   ARPA    CONF81  GM      NASA    NSF78   NSF81   SRI     total
-----  ------  ------  ------  ------  ------  ------  ------  ------  -----
01/81      0       0       0       0       0    3820       0       0    3820 
02/81      0       0       0     756       0    8004       0       0    8760 
03/81      0       0       0     757-      0     756   10650       0   10650 
04/81      0       0       0       0       0       0       0       0       0 
05/81      0       0       0       0       0       0       0       0       0 
06/81      0       0       0       0       0       0       0       0       0 
07/81      0       0       0       0       0       0       0       0       0 
08/81      0       0       0       0       0       0       0       0       0 
09/81      0       0       0       0       0       0       0       0       0 
Summary of TRAVEL by month by grant.

month  ALCOA   ARPA    CONF81  GM      NASA    NSF78   NSF81   SRI     total
-----  ------  ------  ------  ------  ------  ------  ------  ------  -----
01/81      0     874       0       0       0     212       0     947    2033 
02/81      0       0       0       0       0       0       0       0       0 
03/81      0       0       0       0       0       0       0       0       0 
04/81      0       0       0       0       0       0       0       0       0 
05/81      0       0       0       0       0       0       0       0       0 
06/81      0       0       0       0       0       0       0       0       0 
07/81      0       0       0       0       0       0       0       0       0 
08/81      0       0       0       0       0       0       0       0       0 
09/81      0       0       0       0       0       0       0       0       0 
Summary of TOTAL-SPENT-THIS-MONTH by month by grant.

month  ALCOA   ARPA    CONF81  GM      NASA    NSF78   NSF81   SRI     total
-----  ------  ------  ------  ------  ------  ------  ------  ------  -----
01/81    993   14625    6909    4485    4009    8514       0   13635   53172 
02/81    993   18198    1600    2205    1775   13263       0   11474   49510 
03/81      0   21883       0     757-   5727     756   26690       0   54300 
04/81      0   22449       0       0    5727       0   10826       0   39002 
05/81      0   23537       0       0    4639       0   10826       0   39002 
06/81      0   28176       0       0       0       0   10826       0   39002 
07/81      0   41143       0       0       0       0   13448       0   54592 
08/81      0   41143       0       0       0       0   13448       0   54592 
09/81      0   43426       0       0       0       0   14369       0   57795 
Summary of BALANCE-REMAINING by month by grant.

month  ALCOA   ARPA    CONF81  GM      NASA    NSF78   NSF81   SRI     total
-----  ------  ------  ------  ------  ------  ------  ------  ------  -----
01/81   7020  188993    5938   11139   20730   17307  200000   11487  462617 
02/81   6026  170794    4338    8934   18955    4044  200000      13  413106 
03/81   6026  148911    4338    9690   13228    3288  173309      13  358806 
04/81   6026  126462    4338    9690    7500    3288  162483      13  319803 
05/81   6026  102924    4338    9690    2861    3288  151657      13  280801 
06/81   6026   74748    4338    9690    2861    3288  140831      13  241799 
07/81   6026   33604    4338    9690    2861    3288  127383      13  187206 
08/81   6026    7540-   4338    9690    2861    3288  113934      13  132614 
09/81   6026   50966-   4338    9690    2861    3288   99565      13   74819